Gallery: See How Boeing Is Piecing Together Its New Stretch Dreamliner
Audre Norris with Flying Pig Apparel (via http://flyingpigapparel.wordpress.com/)01787-9 roll out
Between production delays and battery issues, it's been a challenging gestation and infancy for the Boeing 787. But despite the many setbacks, the company continues to move full speed ahead with new versions of its fuel-efficient composite Dreamliner. The current model, the 787-8, made its [first flight in December 2009](http://stag-komodo.wired.com/autopia/2009/12/boeing-test-pilots-discuss-historic-first-flight-of-787/) and after being grounded earlier this year due to a pair of [battery related fire/melting events](http://stag-komodo.wired.com/autopia/2013/01/boeing-787-electric-fire-grounding/), more than 70 are flying the skies with airlines around the world. The next version, the slightly longer 787-9 has finally made its public debut and is expected to make its first flight soon. The 787-9 is 20 feet longer than the original Dreamliner and has room for about 40 more seats for a total of up to 290. It's also capable of slightly longer flights, adding about 300 miles to the 8,200 mile range of the 787-8. An even longer version, the predictably named 787-10, was formally announced at the Paris Air Show in June. That airplane will add another 18 feet and 40 more seats. Construction has yet to begin on the 787-10, but we had a chance to visit the Dreamliner factory north of Seattle while the new 787-9 was being built earlier this summer. The airplane shares the same composite design and efficiency of its smaller sibling, including the same wing, though they are strengthened to handle the additional weight. With much of the learning curve of building a new composite airliner behind them, Boeing has had better luck sticking to its planned development schedule for the 787-9. If the flight testing continues on the same path, Air New Zealand is expected to take delivery of the first 787-9 during the middle of next year.
02Boeing787-9 forward fuselage
The forward fuselage section of the first 787-9 sits in a jig awaiting final assembly at the factory in Everett, Washington. *Photo: Jason Paur / WIRED*
03Boeing787-9 nose
Just in case anybody forgets which airplane they are working on. *Photo: Jason Paur / WIRED*
04Boeing 787-9 wing
The sleek, efficient wing of the 787-9 sits in place on a jig with the forward fuselage, awaiting the center section. The curve of the wingtip reduces the drag caused by the interaction of the airflow over the top and bottom of the wing. *Photo: Jason Paur / WIRED*
05Boeing787-9 engine pylon
The engine pylon are ready for the massive Rolls Royce Trent 1000 that will power the first 787-9 to be used in flight testing. Airlines can order both the 787-8 and -9 with either the Rolls Royce, or the General Electric GEnx engines. Each engine weighs nearly 13,000 pounds. *Photo: Jason Paur / WIRED*
06Boeing787-9 wing box
A Boeing team inspects the outside of the center wing box. Like much of the airplane, most of the center wing box is made from composites, but that section is hidden from view inside the fuselage. The area where the wing is joined to the fuselage is made of a titanium alloy and early in the production of the 787-8 there was a design issue discovered with way the wing attached to the wing box, leading to the improper distribution of the stress load. *Photo: Jason Paur / WIRED*
07Boeing787-9 wing end
Here's the wing root that's joined with the wing box in the previous photo. The two titanium pieces are attached, and with the redesign, the massive stress loads are properly distributed throughout the center wing box. The orange wiring seen at the leading edge of the wing is for flight test instrumentation, a standard technique in the aerospace industry to easily distinguish the standard essential wiring from those used only in testing. *Photo: Jason Paur / WIRED*
08Boeing 787-9 cockpit
Just a friendly reminder inside the cockpit to remove the bright orange plastic covering before you try and fly the 787-9. *Photo: Jason Paur / WIRED*
09Boeing787-9 tail
Like most airliners, the vertical part of the tail of the 787-9 – particularly the rudder – is painted before final assembly because it must be precisely balanced. The center fuselage section can be seen in the background. *Photo: Jason Paur / WIRED*
unknown10787-9 Final Body Join
All of the major sections of the first 787-9 are together on the assembly line in Everett, Washington. Next major item to be added are the engines as the final pieces are put together and the airplane heads to the paint booth. *Photo: Boeing*
11787-9 Factory Rollout
Showing off the new style of Boeing livery, the first 787-9 heads for its parking spot where the Rolls Royce engines were started for the first time last Thursday. The first flight is expected in the coming weeks. *Photo: Boeing*
Tesla’s ‘Full Self-Driving’ Becomes ‘Assisted Driving’ in Europe
The automaker has been criticized for misleading drivers with the feature’s name. Now it’s renaming it for European regulators.
Aarian Marshall
Book Publishers Are Quietly Using More AI. Staff Are Revolting
Workers at three major publishing houses tell WIRED that LLMs are being used for publicity, cover art, back cover copy, and emails, as some execs push junior staff to champion the tech.
Adam Morgan
NASA Just Made Nearly 1 TB of Artemis II Data Available to the Public
The data drop includes photographs, audio, video, and astronauts’ notes that will be used to study the moon and prepare for future human missions.
Jorge Garay
The DOJ Is Weighing Perjury Charges Against Cassidy Hutchinson
The Justice Department is considering a perjury and obstruction-of-justice case against Cassidy Hutchinson, a former White House aide who testified against Donald Trump to the January 6 committee.
Hugo Lowell
I’m Still Convinced the iPod Was the Perfect Gadget
Apple’s original music player got many things right. Chief among them: It didn’t connect to the internet.
Steven Levy
Dunking on Dating App Profiles Is Content Gold. People Are Getting Sick of It
Relationship coaches, TikTokers, and disgruntled singles alike frequently shame bad profiles, as more apps experiment with blocking screenshots.
Jason Parham
I’ve Tested the 3 Mac Desktops That Apple Makes, and There’s a Clear Winner
Apple’s Mac desktops have become some of the most sought-after computers this year, driven by surging interest in agentic AI. Here’s which model to buy depending on your use case.
Luke Larsen
The Best Battery-Powered Leaf Blowers for Taking Back Your Weekend
It’s finally time to ditch the gas canister—I tested these cordless leaf blowers on gravel, wood chips, and even a 5-pound concrete paver.
Sal Vaglica
Even Law & Order Is Terrified of AI
In its 26th season premiere, the procedural legal drama paints a damning picture of power-mad AI CEOs.
Ej Dickson
A New Mexico Community Was a Place to Build a Life. Then a Hypersonic Missile Factory Showed Up
Castelion—a next-generation defense tech company—is building a facility in Rio Rancho Estates that documents show could pose a major fire and chemical hazard to neighboring communities.
Yulia Almazova
America’s Hybrid Hype Has Hit the Used Market
Demand is so high that some used cars are selling for more than new ones.
Aarian Marshall
Top H&R Block Coupon: 25% Off DIY + Tax Pro Assist
Save over 25% when you opt for H&R Block’s free online offering, plus a tax pro review.
Molly Higgins